Welding technology Markets
Beadless welding Butt welding Clean-room welding E-socket welding Simultaneous welding Welding of XXL pipes
Beadless welding Butt welding Clean-room welding E-socket welding Simultaneous welding Welding of XXL pipes
An innovative data centre for DATA4 POLAND was built in Jawczyce, near the Polish capital Warsaw. A key factor in
AGRU Kunststofftechnik GmbH has opened its sixth plant in Bad Hall with effect from 1 September. The silver-coloured building, with
Klosterneuburg and Korneuburg are two Lower Austrian municipalities located directly opposite each other on the banks of the river Danube.
For the production of large parts Extruded blocks in PP-R and PVDF up to 100 mm thickness available from stock
Exactly adapted to FRP stub flanges * Exact adjustment of the backing rings to * FRP stub flanges * High
Special design: * Injection molded fitting * Perfect flow characteristics * Butt- and electrofusion welding Premium material PP-R: * Outstanding
The induction E-coupler consists of a metal ring, which is covered with PE or PP by injection molding. The ring
Special design offers: * Perfect stability * Outstanding strength * Superiour connection Nominal OD connection to metallic flanges: * Cost
The AGRU Stop-Off-Saddle is used wherever damage to gas pipes must be repaired quickly and when there are no valves